Statutory ARB Registration: 069273E

Aneurin Bevan University Health Board

Lead Architect: Nigel Robert Holt

Registered architect practicing in Newport (NP18 3XQ) and serving local planning authorities.

ARB Validated 94% Approval Rate

Practice Overview & Credentials

Aneurin Bevan University Health Board is an official Architects Registration Board (ARB) verified practice registered under statutory reference 069273E. Based at South Gwent Area Health Authority St. Cadocs Hospital Lodge Road Caerleon Newport Newport NP18 3XQ United Kingdom, the practice provides architectural design and planning services across Newport and adjacent authority jurisdictions.

As a planning-aware architecture studio, proposals are aligned with the local development framework of Newport. The practice focuses on residential expansions, loft conversions, eco-remodels, and planning-sensitive alterations that maximize liveable volume while satisfying strict local boundary constraints, precedent assessments, and statutory building regulations.

Project Specialties

Residential ExtensionsLoft & Basement ConversionsListed Buildings & ConservationPermitted Development RightsContemporary Eco-RemodelsFeasibility & Massing Studies

Planning Track Record

Newport Area Precedents

Illustrative application results filed and successfully approved under design frameworks typical of Newport.

Householder Application26/04581/H

Double storey side extension and dormer roof alteration.

Newport, NP18

ApprovedAPR 2026
Certificate of Lawful Development25/09124/CP

Rear single-storey kitchen/dining expansion under PD limits.

Newport, NP18

ApprovedNOV 2025
Listed Building Consent25/01140/L

Internal layout modification and window reinstatement works.

Newport, NP18

ApprovedMAR 2025

Early Feasibility Calculator

Simulate your proposed building dimensions to estimate likely architectural drawing fees and planning route parameters.

Estimated Design & Drawing Fees£3,800 - £5,500Subject to site constraints & survey
Likely Planning Application RouteFull Householder PermissionDesign parameters exceed standard Permitted Development limits. Full architectural drawing package and council validation required.

Other Architects in Newport

View All →